EMBER Resources
Investor Calendar
Community Calendar
Contact Us
About Ember
Operational Overview
Operational Photos
Management Team
Board of Directors
Corporate Governance
Health, Safety & Environment
Investor Relations
Executive Summary
Reporting
Press Releases
Presentations/Webcasts
Stock Quote
Analyst Coverage
Coalbed Methane
FAQ on CBM
CBM Background
CBM and the Environment
Community Relations
Message to the Community
Community Landholdings
Corporate Fundraising
Community FAQ
Your Community Representative
Industry Related Resources
Home
>
About Ember - Operational Photos
Operational Photos
Use of ground mats minimize land disturbance
Purpose built drilling rigs minimize lease construction requirements
CBM "Rigless" well stimulations utilize an inert gas to protect groundwater resources
Multifunction completion equipment reduces service trips (traffic) to the wellsite
Producing CBM wellsite surface footprint allows close proximity to agricultural operations
CBM drilling operations typically require less than 48 hours from move-in to move-out
CBM production facilities and wellsites require minimal vehicle traffic
CBM stimulation treatments are performed less than four hours from rig-in to rig-out
Remote wireless well production equipment eliminates routine CBM site visit requirements
CBM pipeline equipment and time requirements minimize surface land disturbance
Low pressure CBM gathering pipelines are installed quickly with minimal surface preparation
CBM drilling and completion operations are timed to minimize the effects on agriculture
Ember Resources Inc.
Eau Claire Place II
800, 521 - 3rd Avenue S.W.
Calgary, Alberta
T2P 3T3
Telephone: 403 270-0803
Facsimile: 403 270-2850